Transmission and Distribution lines, substations and electrical maintenance

Utilizamos cookies propias para realizar un seguimiento de las interacciones de los usuarios en el sitio web y la actividad general de la misma.

Si usted continúa navegando, consideramos que acepta su uso. Puede cambiar la configuración y obtener más información. Usted puede leer más en nuestra Politica De Privacidad.

Business Units

    You are in
  • Business Units
  • Energy
  • Transmission and Distribution lines, substations and electrical maintenance

Transmision & Distribution lines, substations and electrical maintenance

Our experience in electrical infrastructure markets, directed our expansion strategy into these mature and highly competitive markets, in which we offer our services to Utilities in their areas of generation, transportation and distribution; performing preventive maintenance work, managing breakdowns and line modifications, carrying out line voltage work, in addition to constructing electrical substations.

Our companies are certified to work on High Voltage Transmission lines and power distribution substations of up to 220 KV.

 

KEY PROJECTS

Transmission electrical lines (overhead and underground); performed by Juan Galindo T&D: 

  • 400 kV haigh voltage OTL; CFE, Sinaloa, Mexico (1 Km).
  • 220kV high voltage OTL, Socabaya in Arequipa, double circuit (205 Km).
  • 138 kV OTL for TESUR Nueva Tintaya-Tintaya (10 Km), Peru.
  • 132kV high voltage overhead line, Santa María de Nieva windfarm substation to a IBERDROLA substation (35 Km).

  • 132kV high voltage OTL, Endesa Distribution (50 Km).

  • 132kV high voltage OTL, Endesa (50 Km).

  • 132kV high voltage OTL from CSP "La Africana" Power Plant to Posadas Substation (9Km).

  • 115 kV high voltage OTL for CFE  in Culiacan, Mexico.

 

Electrical substations:

  • 400/115 kV "Culiacan Poniente" Substation with 4 Power Transformer 125 MVA each.

Maintenance of electrical distribution networks for major utilities:

© 2011 Grupo Ortiz. All rights reserved