Within this sector, Grupo Ortiz constructed as an EPC contract, a 50 MW Power Plant and with parabolic trough technology with moltensalt storage, which began comercial operation from November of 2012. The moltensalt storage system is sized for 7.5 h and is one of the 19 plants in the total of 50 installed in Spain with this technology. The plant is located in Fuente Palmera (Córdoba), and is being operated and maintained by Grupo Ortiz.

KEY PROJECT

La Africana (50 MW) CSP Plant in Almodovar del Río, Córdoba

 

 

 

 

 

 

 

 

 

 

 

 